
Demonstration project · fictional
Wall removal and beam
Main floor, opened
Three small rooms became one: a load-bearing wall came out, an engineered beam went in, and the ceiling was clad in hemlock.
- Area
- 1,150 sq ft (107 m²)
- Time on site
- 14 weeks on site
- Scope
- Structural engineering
- Load-bearing wall removal
- Engineered beam and post
- Hemlock ceiling, new floor
- Materials
- Glulam beam
- Hemlock ceiling boards
- Engineered oak floor
- Lime plaster walls
Before and after
The brief
Light from both sides of the house, and room for everyone at once.
The structure
A 24-foot glulam beam carries the floor above; one steel post hides in the wood wall.
On site
Temporary shoring for two weeks; the family stayed in the house throughout.
Planning something similar?
A three-step estimate, then a written range for your project.
Start an estimate